PROTRAC is a manufacturer of diesel engines that has four assembly plants in Europe. They are located in Leipzig (Germany), Nancy (France), Liege (Belgium) and Tilburg (Netherlands). The engines parts come in kits from the United States for final assembly in Europe. The engines are shipped from the US to three ports: in Amsterdam (Netherlands), Antwerp (Belgium) and Le Havre (France). Upon arrival at the destination port, engines are shipped to the production plants.

Need assignment help for this question?

If you need assistance with writing your essay, we are ready to help you!

OUR PROCESS

Order

Payment

Writing

Delivery

Why Choose Us: Cost-efficiency, Plagiarism free, Money Back Guarantee, On-time Delivery, Total Сonfidentiality, 24/7 Support, 100% originality

Screen Shot 2015-04-27 at 7.23.38 PM.png

Demand at each Plant

Plant: ; ; ;Leipzig ; ; Nancy ; ; Liege ; ;Tilburg ; ; ;Total

# engines 400 ; ; ; ; ; 900 ; ; ; ; 200 ; ; ; ;500 ; ; ; ; 2000



PROTRAC negotiated contracts for a set maximum volume at each port:

Max Supply of Engines ;

Port: ; ; ;Amsterdam ; ; Antwerp ; ; ;Le Havre ; ; ;Total

# engines ; ; 500 ; ; ; ; ; ; ;700 ; ; ; ; ; ; ;800 ; ; ; ; ;2000


The engines are transported by common carrier and charges are on a per-engine basis.

Cost to Transport an Engine from Port to Production Plant

  1. 1) ;PROTRAC must decide how many engines to send from each harbor to each plant. Using solver in Excel determine the solution that would minimize cost for PROTRAC.

  2. 2) ;Realizing that they may need more flexibility in their network, PROTRAC negotiated with a fourth port located in Rotterdam. The shipping costs from Rotterdam are included below. They can ship up to 300 engines through Rotterdam, on top of the capacity already available at of other ports. Would this solution save money for PROTRAC? If so, how much? If not, how much more expensive is it?

    Screen Shot 2015-04-27 at 7.23.02 PM.png

Conduct your computations in Excel using Solver. Please answer and question 1 and 2 into two separate worksheets. Submit your Excel file. ;